翻訳と辞書
Words near each other
・ Xiangtang–Putian Railway
・ Xianguangia
・ Xiangxi Airport
・ Xiangxi Tujia and Miao Autonomous Prefecture
・ Xiangxiang
・ Xiangxipus
・ Xiangxue Eisiti (Hong Kong)
・ Xiangyan Temple
・ Xiangyan Temple (Xichuan)
・ Xiangyang
・ Xiangyang (disambiguation)
・ Xiangyang District, Hegang
・ Xiangyang District, Jiamusi
・ Xiangyang Liuji Airport
・ Xiangyang Mountain
Xiangyang–Chongqing Railway
・ Xiangyi Li
・ Xiangyin County
・ Xiangyin Road Station
・ Xiangyuan County
・ Xiangyulubei Station
・ Xiangyulunan Station
・ Xiangyun
・ Xiangyun Airport
・ Xiangyun County
・ Xiangyun, Nan'an, Fujian
・ Xiangzhong Yang
・ Xiangzhou
・ Xiangzhou County
・ Xiangzhou District, Xiangyang


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Xiangyang–Chongqing Railway : ウィキペディア英語版
Xiangyang–Chongqing Railway
The Xiangyang–Chongqing Railway or Xiangyu Railway (襄渝铁路), also known as the Xiangfan-Chongqing Railway and Xiangyu Line (襄渝线), is a single-track electrified railroad in central China between the cities of Xiangyang, formerly known as Xiangfan, and Chongqing. The short form name for Chongqing is Yu (渝) and the railway is named after the two cities. It has a total length of 895.3 km and passes through Hubei, Shaanxi and Sichuan province, and Chongqing municipality. Major cities along route include Shiyan, Ankang, Dazhou and Guang'an.
The Xiangyu Railway is a major transportation route that connects the Sichuan Basin with the Central Plains. It was built from 1964 to 1979, and electrified in three phases from 1980 to 1998. Trains running on the Xiangyu Line can reach top speeds of 100–120 km/h. Construction of a second track began in 2005 and was completed in 2009.
==Second Xiangyu Line==
The Second Xiangfan-Chongqing Railway (襄渝二线) is a dual-track electrified railroad line that runs parallel to the Xiangyu Line. This line is only 507 km in length and connects the same cities as the original Xiangyu line. It takes a more direct route through the mountainous terrain with bridges and tunnels, and accommodates faster trains (up to 160 km/h) and a greater carrying capacity. Construction began on August 13, 2005.〔(挺进,挺进——襄渝二线工程建设见闻 ) May 9, 2006〕 and was scheduled to be completed by July 2008, but work was slowed by difficulties in bridge and tunnel work which pushed the project 30% over budget.〔(襄渝铁路二线明年七月通车 火车8小时到西安 ''重庆晚报'' ) Oct. 9, 2007〕 The New Iron Mountain Tunnel (新铁山隧道), 3,347 m length, was completed on April 20, 2007 after 20 months of difficult work, overcoming interior rockslides and carbon monoxide build-up inside the tunnel.〔(中国铁道建筑总公司, "中铁二十三局襄渝二线新铁山隧道贯通" ) May 8, 2007.〕
The Second Xiangyu Line opened on October 31, 2009.〔(Chinese) ("襄渝二线铁路正式运营" ''四川在线-四川日报(成都)'' ) Nov. 11, 2009〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Xiangyang–Chongqing Railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.